|
Product Detail :
|
Construction of 17 Nos Forward BOPs 14 Nos BOPs of Company level and 3 Nos BOPs of Platoon level in the State of Tripura for Border Security Force along Indo Bangladesh Border SH C/o 1 No Company level BOP at Simna- II and 1 No Company level BOP at Sewaram Para including internal Electrification installation including compound lights and service connection to Building Package II SW Carrying out of Preliminary detailed survey of existing old fencing at various location Details of stretches as 49 BN From BP No. 2046 4S to 2050 M - 6.679 Km From BP No 2061 M to 2063 M - 2.472 Km From BP No. 2064 4S to 2066 8S - 2.213 Km Total length- 11.364 Km in the Tripura State.
|