Product Detail :
|
Extra Ordinary Repair of IBB Roads in the stretches under IBBR ID- 94 (16.12 Km), ID-96, 97 and 97A (33.33 Km), ID-98D, 98E, 98F , 98H, 98I and 98J(20.10 Km) ID-99, 99A, 99B, 100, 100A, 101, 102, 102A and 102B (31.10 KM), ID-103, 104, 104A, 104B AND 104C930.736 KM), ID-104, 106C (2.893 KM) AND ID-114C, 114E(8.00 KM). Total Length- 142.279 Km in the state of Tripura along Indo- Bangladesh Border. SH- EOR of IBB roads in the stretches under IBBR ID- 98D, 98E, 98F, 98H, 98I AND 98J (20.10 KM) AND IN ID-99,99A,99B, 100, 100A, 101, 102, 102A AND 102B (31.10 KM) TOTAL LENGTH- 51.20 KM (PACKAGE-II) SW- Carrying out Topographical Survey, Soil Investigation, Design and Drawing for plugging of Nallah Gap at Bamutia BP No. 2024 under 42 BN BSF.
|